3-sec Color Report


ChatGPT said:

Perfect choice ✅ — you’ll now get the full smart version of the Expense Clearance Tracker — combining both:

✔️ Progress Bar + % Completion logic, and

✔️ Cost Control Columns (Cost Ref vs. Budget check, with auto color evaluation).

Here’s the final table layout before I generate your Excel version (with formulas & conditional color rules ready):

🎓 eLearning Module – Expense Clearance & Budget Control System

💡 Module Code: FIN-CASM-ECL-01

🗂 Level: Staff & Supervisor

📍 Applicable For: All Departments under CASM / Finance Control

📘 1. Learning Objectives / သင်ခန်းစာအဓိကရည်ရွယ်ချက်များ

English:

By the end of this module, learners will be able to:

1️⃣ Understand how to record and clear departmental expenses systematically.

2️⃣ Apply the 3-Second Color Rule (🔴🟡🟢) for progress and budget control.

3️⃣ Interpret color status and take corrective action accordingly.

4️⃣ Use the Excel-based Expense Tracker to automate status and color logic.

မြန်မာ:

ဤသင်ခန်းစာပြီးဆုံးချိန်တွင် သင်တန်းသားများသည် –

၁️⃣ ဌာနဆိုင်ရာ အသုံးစရိတ်များကို စနစ်တကျ မှတ်တမ်းတင်၍ ရှင်းလင်းနိုင်ခြင်း။

၂️⃣ တိုးတက်မှုနှင့် ဘတ်ဂျက်ထိန်းချုပ်မှုအတွက် ၃-စက္ကန့်အရောင်စနစ် (🔴🟡🟢) ကို အသုံးပြုနိုင်ခြင်း။

၃️⃣ အရောင်အခြေအနေကို သိရှိပြီး သင့်တော်သော ပြင်ဆင်မှု လုပ်ဆောင်နိုင်ခြင်း။

၄️⃣ Excel အခြေခံ Expense Tracker ကို အသုံးပြု၍ အလိုအလျောက် အရောင်သတ်မှတ်မှု တင်သွင်းနိုင်ခြင်း။

⚙️ 2. Concept Overview / အကြောင်းအရာအနှစ်ချုပ်

English:

The Expense Clearance System is designed to track all payments, advances, and reimbursements across departments, ensuring each item is aligned with approved budgets and deadlines.

The 3-Second Rule ensures that management can instantly recognize the financial and operational condition of any project by color:

🟢 On Track 🟡 Caution 🔴 Delayed / Over Budget

မြန်မာ:

Expense Clearance စနစ်သည် ဌာနတစ်ခုစီ၏ ငွေပေးချေမှု၊ ကြိုတင်သုံးစွဲမှု နှင့် ပြန်အမ်းငွေများကို စနစ်တကျ စစ်ဆေးရန် ရည်ရွယ်သည်။

၃-စက္ကန့်စည်းမျဉ်း သည် အရာထမ်းများနှင့် မန်နေဂျာများအတွက် လုပ်ငန်း / ငွေကြေး အခြေအနေကို အချိန်မီ သိရှိနိုင်စေရန် အရောင်ဖြင့် ပြသပေးခြင်းဖြစ်သည်။

🟢 တစ်ဆင့်တစ်ဆင့် အောင်မြင် 🟡 သတိထားရန် 🔴 နောက်ကျ / ဘတ်ဂျက်ကျော်

🧩 3. Structure of the Expense Tracker / Excel တည်ဆောက်ပုံ

GroupColumns IncludedPurpose / ရည်ရွယ်ချက်
General GroupItem Name / Owner / Action Plan / Control DeptIdentify responsibility & accountability / တာဝန် သတ်မှတ်ခြင်း
Budget Control GroupCost Ref / Budget / Actual CostCompare spending against approved limit / အသုံးစရိတ်ကို ထိန်းချုပ်ခြင်း
Progress Control Group% Completion / Review Dates / Overall StatusMeasure progress & deadline / လုပ်ငန်းတိုးတက်မှု နှင့် အချိန်အကြောင်း အခြေအနေ
Remark ColumnFinal ObservationAuto color based on variance rule (Green = OK, Yellow = Caution, Red = Over)

🧮 4. Color Coding Logic / အရောင်သတ်မှတ်မှု စည်းမျဉ်း

SymbolMeaning (English)အဓိပ္ပါယ် (မြန်မာ)Criteria
🟢Within Budget / On Scheduleဘတ်ဂျက်အတွင်း နှင့် အချိန်မှန်Actual ≤ Min(Cost Ref, Budget) and Progress ≥ 80 %
🟡Near Budget / Slight Delayဘတ်ဂျက်နီးစပ် / အနည်းငယ် နောက်ကျBetween Cost Ref and Budget or Progress 40–79 %
🔴Over Budget / Delayedဘတ်ဂျက်ကျော် / နောက်ကျActual > Budget or Progress < 40 %

📊 5. Practical Example / လက်တွေ့ဥပမာ

NoExpense ItemCost Ref (MMK)Budget (MMK)Actual (MMK)% CompletionOverall StatusRemark
1Staff Training Trip2,500,0002,800,0002,450,00090 %🟢 On TrackCost < Budget → Good
2QC Lab Proposal3,000,0003,200,0003,450,00040 %🔴 DelayedCost > Budget → Over
3MDC Boat Maintenance1,800,0002,000,0002,100,00060 %🟡 PartialSlightly Over Budget

🧭 6. Action & Control Flow / လုပ်ဆောင်မှု လမ်းကြောင်း

English:

1️⃣ Data entry by Owner → 2️⃣ Review by Control Dept → 3️⃣ Automatic color coding → 4️⃣ Manager review → 5️⃣ Close or Escalate.

မြန်မာ:

၁️⃣ ဌာနအလိုက် တင်သွင်းမှု → ၂️⃣ Finance/CASM စစ်ဆေးမှု → ၃️⃣ အလိုအလျောက် အရောင်သတ်မှတ်ခြင်း → ၄️⃣ မန်နေဂျာ သုံးသပ်ခြင်း → ၅️⃣ အပြီးသတ် သို့မဟုတ် တင်ပြခြင်း။

🧰 7. Excel Automation Functions Used / အသုံးပြုထားသော Excel Formula

FunctionPurposeExplanation
CHOOSE()Displays 🟢🟡🔴 based on criteriaChooses which symbol to show
IF()Conditional logicTests Budget and Progress rules
TEXT()Converts date to dd-mmm-yyUsed for Review Dates
MIN()Picks lower of Cost Ref & BudgetFor Green condition
DataBarRule()Shows progress barVisual completion indicator

🧠 8. Case Study (Deep Analysis x 3)

Case A – Training Trip (Budget Success)

✅ All receipts submitted before deadline.

✅ Actual Cost < Budget.

→ 🟢 Green – System auto-marks “Good to Close”.

Case B – QC Lab Proposal (Delay & Overrun)

⚠️ Missing supplier invoice.

❌ Actual > Budget by 8 %.

→ 🔴 Red – System alerts CASM Control for follow-up.

Case C – Boat Maintenance (Partial)

🟡 Yellow flag due to slight delay and minor cost overrun.

→ Requires Finance review but not critical.

9. FAQ (Deep Level x 5)

Q (English)A (English)Q (မြန်မာ)A (မြန်မာ)
What if Actual is lower than Ref cost?It shows 🟢 – efficient spending.Actual က Ref ထက် နည်းလျှင်?🟢 သုံးစွဲမှု ထိန်းသိမ်းမှု ကောင်းသည်။
Who approves Red status items?CASM Head & CFO.Red ဖြစ်ပါက ဘယ်သူ အတည်ပြုမလဲ။CASM နှင့် CFO အတည်ပြုရမည်။
Can we edit Overall Status?No, it’s automatic – locked formula.Overall Status ကို ပြင်နိုင်ပါသလား။မပြင်နိုင်ပါ – Formula ဖြင့် အလိုအလျောက်။
When do we reset Review Dates?After each monthly review.Review Date အသစ် ပြင်ချင်လျှင်?လစဉ် သုံးသပ်ပြီး နောက် ပြင်နိုင်သည်။
How is Remark color decided?Based on Actual vs Budget logic.Remark အရောင် သတ်မှတ်ခြင်း အခြေခံချက်က?Actual နှင့် Budget နှိုင်းယှဉ်မှု အပေါ် မူတည်သည်။

🎯 10. MCQs – Knowledge Check (20 Questions – Dual Language)

(Sample shown below – full set to continue in PowerPoint version)

1️⃣ What is the main function of Expense Tracker?

➡️ To monitor spending and progress in real time.

အဓိက ရည်ရွယ်ချက်က ဘာလဲ။

➡️ အသုံးစရိတ် နှင့် တိုးတက်မှုကို အချိန်မီ စောင့်ကြည့်ရန်။ ✅

2️⃣ If Actual > Budget, system color = ? 🔴

Actual > Budget ဖြစ်ပါက အရောင် ဘယ်လို ဖြစ်မလဲ။ 🔴

3️⃣ Who is responsible for Progress Group? → CASM Dept.

Progress Group ကို အဓိက တာဝန် ရှိသူ။ → CASM ဌာန။ ✅

4️⃣ Green in Remark means what? → Good spending within Budget.

Green ဆိုတာ ဘယ်လို အဓိပ္ပါယ်။ → ဘတ်ဂျက်အတွင်း သုံးစွဲမှု။ ✅

5️⃣ What formula decides color ball for Review Date? → CHOOSE()

Review Date အတွက် အရောင် သတ်မှတ်မှု Formula က ဘာလဲ။ → CHOOSE() ✅

(Full MCQ set 20 – to be auto-randomized in LMS version)

🎥 11. YouTube Learning Integration

1️⃣ Budget Control Basicshttps://youtu.be/VJ5s3F4fV6o

2️⃣ Conditional Formatting in Excelhttps://youtu.be/2y4J9T0b9aA

3️⃣ Visual Dashboards for Finance Trackinghttps://youtu.be/mzRz5d0G-Kk

🧾 12. Summary & Key Takeaways

English:

✔ Use Expense Tracker for every departmental clearance.

✔ Follow 3-Second Rule for fast decision.

✔ Red = Immediate action, Yellow = Follow-up, Green = Good status.

✔ Control Dept must review monthly and report to Finance & CASM.

မြန်မာ:

✔ ဌာနတိုင်းတွင် Expense Tracker အသုံးပြုပါ။

✔ သုံး စက္ကန့်စည်းမျဉ်း ဖြင့် မြန်မြန် ဆုံးဖြတ်ပါ။

✔ Red = အရေးပေါ်၊ Yellow = စောင့်ကြည့်ရန်၊ Green = အဆင်ပြေ။

✔ Control ဌာနမှ လစဉ် သုံးသပ်ပြီး Finance/CASM သို့ တင်ပြပါ။

🧱 13. Assessment & Certification

CriteriaDescriptionWeight
Practical Excel ExerciseFill out Expense Tracker Sheet50 %
MCQ ScoreMust pass ≥ 80 %30 %
Case Study AnalysisWritten reflection (1 page)20 %

Successful completion earns the CASM – Expense Control Level 1 Certificate.




🎓 eLearning Module: Expense Clearance & Budget Control System (3-Sec Rule Framework)

Module Objective:

To enable staff to manage, track, and evaluate expense clearances through color-coded performance indicators (🔴🟡🟢) and budget control metrics in line with CPC’s CASM–Finance operational standards.

📘 Reading Material

(English + Myanmar Dual Language)

1. Objective of Expense Clearance Tracker

To monitor all departmental expenses efficiently using three key principles — Accountability, Transparency, and Timeliness.

ကုမ္ပဏီ၏ ငွေစာရင်းများကို တာဝန်ရှိမှု၊ ထင်ရှားပြတ်သားမှုနှင့် အချိန်မှန်မှန်ဖြင့် စောင့်ကြည့်နိုင်ရန်အတွက် တိကျပြည့်စုံစွာ စစ်ဆေးရန် ရည်ရွယ်သည်။

2. Purpose of 3-Second Color Rule (🔴🟡🟢)

To visually identify task and budget performance within three seconds — allowing quick management decisions.

၃ စက္ကန့်အတွင်း လုပ်ငန်းတိုးတက်မှုနှင့် ငွေချေးခန့်မှန်းမှုကို မြန်မြန်စွာ သုံးသပ်နိုင်ရန် အရောင်သုံးသပ်မှုစနစ်ဖြင့် ပြသခြင်းဖြစ်သည်။

3. Core Columns & Logic

GroupColumnsPurpose
Budget Control GroupCost Ref / Budget / Actual CostCompare actual spending vs approved budget.
Progress Control Group% Completion / Review Dates / Overall StatusMeasure operational progress, deadlines, and accountability.

4. Color Logic

ColorMeaningAction
🟢Within budget & on scheduleContinue current process
🟡Slight delay or near budgetReview & adjust
🔴Over budget or overdueImmediate corrective action

🧮 Case Studies (3 Samples)

Case 1 – Staff Training Trip (HR)

  • Actual Cost < Budget → 🟢 Green

  • All receipts cleared within deadline

  • Decision: Approve & close

Case 2 – QC Lab Proposal (BD)

  • Actual Cost > Budget → 🔴 Red

  • Delayed submission, missing invoices

  • Decision: Escalate to Finance for investigation

Case 3 – Boat Maintenance (MDC)

  • Actual slightly > Ref, but within Budget → 🟡 Yellow

  • Delay due to documentation from suppliers

  • Decision: Extend grace period

❓ FAQ (5 Common Questions)

  1. Q: What if my expense clearance exceeds the budget by less than 5%?
    A: System flags 🟡 (Caution) — requires supervisor note before approval.

  2. Q: Who updates % Completion?
    A: Each Department Head or Control Dept (Finance/CASM).

  3. Q: How does the Excel file show colors automatically?
    A: Through built-in conditional formatting rules (linked to formulas).

  4. Q: Can I edit the “Overall Status” field manually?
    A: No — it’s auto-calculated based on progress and cost variance.

  5. Q: What happens if both Cost and Progress are Red?
    A: Immediate review by Finance & CASM — must submit justification memo.

🧠 MCQ (Knowledge Check – Dual Language)

No.QuestionOptionsCorrect
1What does the 3-Second Rule mean? / ၃ စက္ကန့်စည်းမျဉ်းဆိုတာဘာလဲ။a) Submit in 3 sec b) Identify status visually fast c) Finish within 3 daysb
2If Actual > Budget, color shown is? / တကယ်အသုံးစရိတ် Budget ထက်ကျော်လွန်ပါက?a) 🟢 b) 🟡 c) 🔴c
3Who controls Budget Group? / Budget Group ကို ဘယ်ဌာန စစ်ဆေးသလဲ။a) HR b) Finance c) CEOb
4% Completion < 40% means? / % ပြည့်မှု 40% ထက်နည်းလျှင်a) 🟢 On Track b) 🟡 Caution c) 🔴 Delayedc
5What is the color for “Within Budget but Delayed”?a) 🟢 b) 🟡 c) 🔴b

🎥 YouTube Integration (Suggested for Training Use)

1️⃣ Budget Tracking Basicshttps://youtu.be/VJ5s3F4fV6o

2️⃣ Using Conditional Formatting in Excelhttps://youtu.be/2y4J9T0b9aA

3️⃣ Visual Dashboards for Expense Managementhttps://youtu.be/mzRz5d0G-Kk


💰 Expense Clearance Tracker – with Budget Control, Progress Bar & 3-Sec Rule

No.Expense ItemOwnerAction PlanControl DeptCost Ref (USD/MMK)Budget (USD/MMK)Actual Cost (USD/MMK)% CompletionProgress BarReview Date-1Review Date-2Last DateOverall Status (Color)Remark
1Staff Training Trip (Bangkok)HR DeptCollect receipts & submit formFinance2,5002,8002,45090 %█████████░ (90%)🟢 08-Oct-25🟢 18-Oct-25🟢 25-Oct-25🟢 On TrackCost < Budget → Good
2QC Lab Proposal ExpensesBD TeamSubmit expense summary & upload to OdooCASM3,0003,2003,45040 %████░░░░░░ (40%)🔴 10-Oct-25🟡 20-Oct-25🔴 30-Oct-25🔴 DelayedCost > Budget → Over
3AGM Preparation CostsCASM TeamReconcile advance vs actualsFinance1,2001,3001,150100 %██████████ (100%)🟢 12-Oct-25🟢 22-Oct-25🟢 05-Nov-25🟢 CompletedVerified & Closed
4EV Charger Demo SetupEngineeringSubmit equipment & logistics claimsBD4,5004,8004,60085 %████████░░ (85%)🟡 15-Oct-25🟢 25-Oct-25🟢 05-Nov-25🟢 On TrackWithin Budget → OK
5MDC Boat MaintenanceMarine UnitPrepare expense summary + fuel logsCASM + Auditor1,8002,0002,10060 %█████░░░░░ (60%)🔴 05-Oct-25🟡 12-Oct-25🟢 20-Oct-25🟡 PartialSlightly Over Budget

🎯 Automated Color Rules (to be applied in Excel)

ColumnLogicColor
% Completion≥ 80 % → 🟢 • 40–79 % → 🟡 • < 40 % → 🔴Conditional format
Cost ControlActual Cost ≤ Cost Ref and ≤ Budget → 🟢 Good • Between Ref and Budget → 🟡 Caution • > Budget → 🔴 OverrunConditional format
Progress BarGradient fill based on % CompletionVisual
Overall StatusDerived from Progress + Cost Control (lowest color wins)Automatic

⚙️ Excel Version Will Include

  • Automatic progress bar and 3-color logic

  • Conditional formatting for Cost Ref / Budget variance

  • Optional filter for “By Control Dept” and “By Owner”

  • Ready for CASM – Finance monthly dashboard view

✅ Please confirm one of the following before I generate the Excel file:

1️⃣ Currency base you prefer → “MMK” / “USD” / “Both columns”?

2️⃣ Do you want me to lock formulas & color logic (for staff data entry only)?


"3-Second Report," it's crucial to define clear and consistent meanings for each color. Here's a breakdown of best practices and examples:
General Principles
  • Consistency: Use the same color meanings across all your reports and dashboards to avoid confusion.
  • Clarity: Ensure the color distinctions are easily noticeable, even for users with color vision deficiencies.
  • Context: Always provide context for the color-coding, either through labels, legends, or tooltips.
  • Actionable Insights: The color-coding should help users quickly identify areas that require attention or action.
Specific Color Meanings
  • Red:
    • Meaning: Critical, urgent, problem, error, high risk, failure, unacceptable.
    • Use Cases:
      • Exceeded budget
      • Missed deadline
      • Critical system error
      • High security threat
      • Unacceptable quality level
    • Action: Requires immediate attention and corrective action.
  • Yellow:
    • Meaning: Warning, caution, potential problem, moderate risk, needs attention, approaching threshold.
    • Use Cases:
      • Approaching budget limit
      • Project delayed
      • Potential security vulnerability
      • Moderate risk level
      • Quality slightly below target
    • Action: Requires monitoring and potential intervention.
  • Green:
    • Meaning: Good, normal, on track, low risk, successful, acceptable.
    • Use Cases:
      • Within budget
      • Project on schedule
      • System operating normally
      • Low security risk
      • Acceptable quality level
    • Action: No immediate action required, but continued monitoring is recommended.
Examples in Different Scenarios
  • Project Management:
    • Red: Project is significantly behind schedule or over budget.
    • Yellow: Project is slightly behind schedule or approaching budget limit.
    • Green: Project is on schedule and within budget.
  • Manufacturing:
    • Red: Production line is down or producing defective products.
    • Yellow: Production line is running below capacity or experiencing minor issues.
    • Green: Production line is running at full capacity and producing high-quality products.
  • Finance:
    • Red: Investment is losing money or performing significantly below expectations.
    • Yellow: Investment is performing moderately well but with some risk factors.
    • Green: Investment is performing well and meeting expectations.
  • Cybersecurity:
    • Red: Critical security threat detected or system vulnerability identified.
    • Yellow: Potential security vulnerability or suspicious activity detected.
    • Green: System is secure and operating normally.
Additional Tips
  • Use Clear Visual Cues: In addition to color, use icons, shapes, or other visual cues to reinforce the meaning of each indicator.
  • Consider Colorblindness: Use color combinations that are easily distinguishable by people with different types of colorblindness. Tools like Coblis (Color-Blindness Simulator) can help you test your color choices.
  • Provide Tooltips: Use tooltips to provide more detailed information about each indicator when the user hovers over it with their mouse.
  • Avoid Overuse: Don't overuse color-coding, as it can become distracting and confusing. Focus on highlighting the most important information.
  • Establish Thresholds: Clearly define the thresholds or ranges that determine when an indicator should be colored red, yellow, or green.
By following these guidelines, you can effectively use red, yellow, and green color-coding to create a "3-Second Report" that provides a clear and concise overview of complex situations.

🧠 Einstein’s Analogy

အိုင်န်စတိုင်း၏ နိယာမနှိုင်းယှဉ်ချက်

English:

Albert Einstein’s Theory of Relativity showed that time and space are not separate — they are interlinked.

A small change in one can bend or distort the other.

In the same way, in project management, “time” and “money” are connected dimensions.

When one is stretched, the other must adjust — but only up to a limit.

Myanmar:

Albert Einstein ရဲ့ သက်ဆိုင်မှုနိယာမ (Theory of Relativity) မှာ အချိန်နဲ့ အာကာသဟာ သီးခြားမဟုတ်ဘဲ ချိတ်ဆက်နေတယ် လို့ ပြသခဲ့ပါတယ်။

တစ်ဖက်မှာ အနည်းငယ် ပြောင်းလဲတာနဲ့ တစ်ဖက်မှာလည်း ပုံသဏ္ဍာန်ကွဲသွားနိုင်တယ်။

Project Management မှာလည်း အတူတူပါပဲ — အချိန် (Time) နဲ့ ပိုက်ဆံ (Money) ဟာ ချိတ်ဆက်နေတဲ့ Dimension နှစ်ခု ဖြစ်ပါတယ်။

တစ်ဖက်ကို တိုးချဲ့ရင် တစ်ဖက်ကိုလည်း ပြုပြင်ညှိပေးဖို့လိုတယ် — ဒါပေမဲ့ သတ်မှတ်အကန့်အသတ်ရှိတယ်။

🏆 Scoring & Evaluation

  • 18 – 20 correct answers → Excellent (🌟)

  • 14 – 17 correct answers → Good (👍)

  • 10 – 13 correct answers → Needs Review (⚠️)

  • Below 10 → Fail / Retake Module (❌)



0 0

There are no comments for now.

to be the first to leave a comment.

3. Which department controls the Budget Group? Budget Group ကို ဘယ်ဌာန ထိန်းချုပ်သလဲ။
4. Which department controls the Progress Group? Progress Group ကို ဘယ်ဌာန ထိန်းချုပ်သလဲ။
5. What color appears when Actual ≤ Budget? Actual သည် Budget ထက် နည်းပါက ဘယ်အရောင် ဖြစ်မလဲ။
6. What color appears when Actual > Budget? Actual သည် Budget ထက် ကျော်လွန်ပါက ဘယ်အရောင် ဖြစ်မလဲ။
7. % Completion ≥ 80 % means ? % ပြည့်မှု ≥ 80 % ဆိုတာ ဘာကို ရည်ညွှန်းသလဲ။
8. % Completion between 40 – 79 % = ? % ပြည့်မှု ၄၀–၇၉ ဖြစ်ပါက ဘယ်အခြေအနေ ဖြစ်မလဲ။
9. % Completion < 40 % = ? % ပြည့်မှု ၄၀ ထက်နည်းပါက ဘယ်အခြေအနေ ဖြစ်မလဲ။
10. If Actual ≤ Ref Cost, the system shows ? Actual သည် Ref Cost ထက် နည်းပါက ဘယ်အခြေအနေ ဖြစ်မလဲ။
11. What does 🟡 Yellow indicate? 🟡 အဓိပ္ပါယ်က ဘာလဲ။
12. Red status requires action from ? 🔴 အခြေအနေ ဖြစ်ပါက ဘယ်ဌာန လုပ်ဆောင်ရမလဲ။
13. Which Excel function selects color ball (🟢🟡🔴)? အရောင် Ball သတ်မှတ်ရာတွင် အသုံးပြုသော Excel function က ဘာလဲ။
14. Which function converts date format to dd-mmm-yy ? ရက်စွဲ format ပြောင်းရန် အသုံးပြုသော function က ဘာလဲ။
15. Which formula compares cost between Ref and Budget ? Ref နှင့် Budget ကို နှိုင်းယှဉ်သည့် Formula က ဘာလဲ။
16. Who updates the % Completion column ? % Completion ကော်လံကို ဘယ်သူ ပြင်သလဲ။
17. Can user manually edit “Overall Status”? “Overall Status” ကို ကိုယ်တိုင် ပြင်နိုင်သလား။
18. When do we update Review Dates ? Review Date ကို ဘယ်အချိန်တွင် ပြင်သင့်သလဲ။
19. What happens when both Progress and Budget are Red ? Progress နှင့် Budget နှစ်ခုလုံး Red ဖြစ်လျှင် ဘယ်အခြေအနေ ဖြစ်မလဲ။
20. Green in Remark Column means ? Remark အကွပ် Green ဖြစ်လျှင် ဘာကို ဆိုလိုသလဲ။