Quiz
0
0
There are no comments for now.
Join this Course
to be the first to leave a comment.
1.
1. What is the core analytical technology used by the BS-230?
2.
2. Where are all the critical instrument parameters stored?
3.
3. A new main board has been installed. What must the engineer do next?
4.
4. Why is it absolutely essential to back up the parameters before replacing the main board?
5.
5. The reagent disk temperature is controlled by a:
6.
6. Which of the following is a consumable component?
7.
7. The side of the Peltier cooler that gets cold is:
8.
8. Before disassembling the power box, what is the crucial first step?
9.
9. The S/R probe has protection against:
10.
10. Which action should you always do before calling for technical support?