๐ฉ Module 7: After-Sales and Support Services
๐ฉ Module 7: After-Sales and Support Services
Importance of training users post-purchase.
Offering preventive maintenance and spare parts.
Repair turnaround time, loaner units, and user education.
Service contract benefits for hospitals.
Here is the full content for:
๐ฉ Module 7: After-Sales and Support Services
๐ For Flexible and Rigid Endoscope Systems
๐ Reading Materials
๐ 1. Importance of Post-Purchase User Training
Even the most advanced endoscope systems require proper handling and cleaning. Many support calls and warranty claims arise from improper use. Therefore, post-purchase training ensures:
End users understand button functions, angulation limits, and cleaning protocols.
Nursing staff learn correct sterilization and drying methods to prevent scope damage or infection risk.
Biomedical teams are trained to perform daily checks and troubleshooting steps.
๐ฅ A one-time training session at installation is not enough. Offer periodic refreshers or on-demand video training modules.
๐งฐ 2. Preventive Maintenance & Spare Parts Supply
Proper after-sales support includes a preventive maintenance plan (PMP) to reduce unexpected breakdowns. This includes:
Scheduled visual inspections and functional tests
Minor part replacements (e.g., o-rings, rubber seals, valves)
Firmware updates (for video processors)
๐ฉ Spare parts inventory should include:
Light guide cables
Suction valves
Biopsy channel brushes
Universal caps and connectors
๐ Tip: Provide a 3-year spare part forecast list with your quotation to help hospital budgeting.
๐ 3. Repair TAT, Loaner Units, and Downtime Management
Repair Turnaround Time (TAT) is critical to hospitals. Communicate clearly:
Standard TAT (e.g., 7โ10 working days)
Service location (in-country or overseas)
Available loaner scopes or video processors during repair
โ Having backup loaner units ensures hospitals don't halt procedures. This builds trust.
๐ 4. Benefits of Service Contracts (AMC/CMC)
Hospitals prefer long-term service contracts (Annual Maintenance Contract โ AMC, or Comprehensive Maintenance Contract โ CMC) for:
Predictable cost planning
Priority service response
Discounted repair parts
Audit-ready documentation
๐ Good practice: Share a sample service contract and explain optional add-ons like extended warranty, performance tracking, and remote support access.
๐๏ธ Suggested YouTube Videos
๐ผ๏ธ Visual Assets to Include
Diagram: Basic Preventive Maintenance Flow
Checklist: Daily/Weekly Cleaning
Table: Spare Parts & Lifecycle Estimate
Sample AMC contract screenshot
โFAQ ร 5 (Dual Language โ One-Liner Format)
Why is post-installation training essential? โ Installation แแผแฎแธแแผแฎแธแแปแแบแธ Training แแแฌแแผแฑแฌแแทแบแแญแฏแกแแบแแฌแแฒ?
โ Prevents misuse and extends product life โ แแแฏแถแธแแพแแบแแผแแบแธแแญแฏแแฌแธแแผแฎแธ แกแแฏแถแธแแถแ แฑแแซแแแบแHow often should maintenance be scheduled? โ Maintenance แแญแฏ แแแบแแพแ แบแแผแญแแบแแฏแแบแแแทแบแแฒ?
โ At least semi-annually โ แกแแแบแธแแฏแถแธ แแผแ แบแแพแ แบแแ แบแแผแญแแบแCan we get replacement units during repair? โ แแผแฏแแผแแบแ แแบแแพแฌ แกแ แฌแธแแญแฏแธแแแบแแแบแแพแฏ แแแญแฏแแบแแฌแธ?
โ Yes, via loaner program โ แกแ แฌแธแแญแฏแธแแฐแแ แบ (Loaner Unit) แแพแแ แบแแแทแบแแแญแฏแแบแแซแแแบแWhat is the advantage of AMC/CMC? โ AMC/CMC แแฌแแแบแแฐแแผแแบแธแแฒแท แกแแปแญแฏแธแแปแฑแธแแฐแธแแแฌแแฒ?
โ Predictable cost and faster support โ แแฏแแบแแปแ แแญแแบแแผแพแฌแแแบแธแแผแฎแธ แแแบแแฑแฌแแบแแพแฏ แแผแแบแแซแแแบแWhich spare parts need frequent replacement? โ แแแผแฌแแ แกแ แฌแธแแญแฏแธแแญแฏแทแแญแฏแแฒแทแกแแญแฏแแ แนแ แแบแธแแฝแฑแแฌแแฝแฑแแฒ?
โ Valves, cables, caps โ Valve, Cable, Cap แ แแแบแแญแฏแทแ
Let me know if you'd like:
A training PPT on this module
Certificate of completion template for trained staff
Sample AMC agreement draft
Or should we move to Module 8: Sales Pitch & Roleplay Scenarios for your sales team?
There are no comments for now.